We have the foundations all prepped and are waiting for an inspection and then a warm weather window to pour concrete. NOAA says Tuesday through Friday should stay above freezing long enough to let our concrete cure. Fingers crossed!
Jake's Mom and Dad. |
We shoveled stone to backfill the insulation form work to prevent it from "blowing out" when the concrete is poured. |
We built forms for the concrete apron at the garage entrance. |
We had to slope the stone around the garage foundation to promote drainage. This is the insulation skirt that is four feet wide around the perimeter. |
The garage all back filled as well. The black pipe is our foundation drain that we had to relocate to provide the slope for the skirt insulation. |