And over all the nails and holes from pulled nails. |
Chalk lines for (from nearest to farthest) the mechanical room, powder room, and coat closet. |
Now with the interior partitions in. |
The powder room. |
The mechanical room. Our electrical panel, cable and internet, water entry, sprinkler system entry, and heat pump water heater will all reside here. |
The day before the big storm. We can't bring ourselves to see what 10-16" of snow on top of this will look like. All the floor joists are in. |
No comments:
Post a Comment