Sunday, September 29, 2013

Building Update #5 - Utilities are In

Last week a significant amount of progress was made.  Our water connection and meter pit went in, our water and sewer pipes were run up to the house and garage, and our electrical and cable/telephone conduits were run.  We plan to install our sub-slab plumbing this week.  Once the sub-slab plumbing is run, we will cover it with crushed stone in preparation for laying our foundation insulation and pouring our foundation slab.

The flags to the right mark where the power pole will be placed.  The stakes to the left are where our buried electrical conduit is waiting.

New rock sculpture made from old and 'new' rocks.

Garage site - the blue and grey piping sticking up are our water and electrical/cable, respectively.  

The house utilities.

House and garage sites taken from edge of the woods.

Looking up the power line at the top of our property.

Looking down the power line easement on our property, just a minute before Baxter disturbed a wasps nest and I ran out of the woods yelling.  Final damage: 7 stings to my head, neck, and upper body.  Baxter and Jake: Zero stings.  
Meter pit before.

Meter pit after.