Building Update #9 - Family Work Weekend Day 2

The weather was gorgeous today and we made a lot of progress.  Couldn't have done it without the support from my parents!  
Finishing up the second layer of foam (5" thick total).

Finishing up the third layer of foam (8" total).

After cutting two strips of 10-mil plastic wrap we laid it on the insulation.

The plastic was heavy and stiff and it took us a few tries to come up with a good system for cutting and placing the holes for the plumbing, electric, water, etc. 

As the light was running out and the raindrops were starting we finished the plastic and put rocks down to keep it in place overnight. 