Our newly rolled driveway and site makes getting up to the house with a car much easier. |
Putting stakes with strings in the ground to serve as reference points to mark pipe runs. |
The plumbing plan. |
Measuring and then painting the drain lines to be dug out. The pipes sticking up are, from left to right, telephone and data, electric, and water. |
All laid out and ready to dig. |
This was a lot harder than we thought it would be. |
Gibralter. |
No comments:
Post a Comment